Base Specifications

  • 26,000 m2 waterside laydown Area / 25 KPA Surcharge
  • Berthing Pocket 204m long 40m wide 8m deep LAT
  • Channel depth 6.2m LAT, 50m wide on approach 80m wide at creek entry
  • 204m of hard backed wharf
  • 175m turning circle including berth pocket
  • LCT ramps x 2 each 50m L x 18m W / 25 KPA Surcharge
  • 700mt crane lift pad/ 60 KPA Surcharge
  • 2 x wharf side fuel browsers, up to 1200 ltr per minute
  • Potable Water, 70K Ltr Capacity on site storage
  • Washpad
  • Automated container washer
  • 30 tonne bollards for vessel mooring located every 30 meters on the wharf
  • 1.8m yokohama fenders provide kinetic energy absorption for vessel mooring operations
  • Security fencing lighting and gating
  • CCTV Live Footage
  • Ashburton Shire Class 4 waste facility opening Q4 2019 – 25km from OMSB
  • RAV 10 rated direct access road due for completion 2019
  • 24 Hour Operations
  • Airport proximity 3km

Base Services

  • Offshore baskets & DNV Inspections
  • Hot Works
  • Quayside fabrication
  • Under keel inspection s
  • Wharf operations, including forklift, crane, LCT ramp, reach stackers
  • Ship chandelling – Fuel, Water, Food, Waste, Spares, Consumables
  • Salt Water Deck Washer
  • Marine husbandry agency
  • Logistics services/ Material Management including inventory storage & handling
  • Pilotage
  • Offsite overflow laydown areas
  • Container packing and cross docking
  • Transport and chain of responsibility programs
  • Decommissioning works and disposal
  • Quarantine Remedition